Articles in international journals and book chapters

Segura, M., Maroto, C., Segura, B., Casas-Rosal, J.C. 2020 Improving Food Supply Chain Management by a Sustainable Approach to Supplier Evaluation. Mathematics, 8, 1952; doi:10.3390/math8111952

Segura, M.; Maroto, C.; Segura, B. and Ginestar, C. 2020. Developing decision support systems for optimising livestock diets in farms. Chapter 11 (ID: 9781786767349) In: Armstrong, L. (Ed). Improving data management and decision support systems in agriculture. Burleigh Dodds Science Publishing.

Segura, M., Maroto, C., Segura, B. 2019. Quantifying the Sustainability of Products and Suppliers in Food Distribution Companies.Sustainability, 11, 5875; doi:10.3390/su11215875

Segura, M., Maroto, C., Belton, V., Ginestar, C., Marques, I.2019 Collaborative management of ecosystem services in Natural Parks based on AHP and PROMETHEE. Chapter in "Cases and Computer Implementations in Multiple Criteria Decision Making/Aiding methods". SPRINGER VERLAG

Segura, M., Maroto C., Ginestar, C., Segura, B. 2018.Optimization Models to Improve Estimations and Reduce Nitrogen Excretion from Livestock Production.Sustainability, 10, 2362; doi: 10.3390/su10072362

Segura, M., Maroto C. 2017. A multiple criteria supplier segmentation using outranking and value function methods. Expert Systems With Applications, 69, 87-100. DOI: http://dx.doi.org/10.1016/eswa.2016.10.031

Segura, M., Maroto C., Ginestar, C. 2017. Valoració multicriteri i col·laborativa dels serveis de l´ecosistema a la Serra d´Espadà. Camp de l´Espadar 20, 43-51.

Segura, M.; Maroto, C.; Belton, V. and Ginestar, C. (2015). A New Collaborative Methodology for Assessment and Management of Ecosystem Services. Forests Vol. 6(5) pp 1696-1720. ISSN: 1999-4907. DOI: http://dx.doi.org/10.3390/f6051696. Open access: HTML Version: http://www.mdpi.com/1999-4907/6/5/1696/html. PDF Version: http://www.mdpi.com/1999-4907/6/5/1696/pdf

Marques-Perez, I.; Segura, B. and Maroto, C. (2014). Evaluating the Functionality of Agricultural Systems: Social Preferences for multifunctional peri-urban agriculture. The "Huerta de Valencia" as case study. Spanish Journal of Agricultural Research, 12(4) pp 889- 901. ISSN: 1695-971X. ISSN (Online):2171-9292. DOI: http://dx.doi.org/ 10.5424/sjar/2014124-6061

Peiro-Signes, A.; Segarra-Oña, M.V. and Maroto, C. (2014). Why do services and manufacturing firms envision the environmental innovation differently? A path-model comparison. Polish Journal of Environmental Studies, 23(5) pp 1691-1697. ISSN: 1230-1485

Segura, M.; Ray, D. and Maroto, C. (2014). Decision Support Systems for Forest Management: a comparative analysis and assessment. Computers and Electronics in Agriculture, 101 pp 55-67. ISSN: 0168-1699. DOI: http://dx.doi.org/10.1016/j.compag.2013.12.005

Maroto, C.; Segura, M.; Ginestar; C.; Uriol, J.; and B. Segura (2013). Sustainable Forest Management in a Mediterranean region: Social preferences Forest System, 22(3) pp. 546-558. ISSN: 2171-5068. ISSN (Online): 2171-9845
http://dx.doi.org/10.5424/fs/2013223-4135
Open access:http://revistas.inia.es/index.php/fs/article/view/4135/1954

Segarra, M; Merello, P.; Segura, M.; Peiro, A; Maroto, C; (2012). Proactividad medioambiental en la empresa: clasificación empírica y determinaci&oacuate;n de aspectos clave. TEC Empresarial. Vol 6 (1) pp. 35-48. ISSN: 1659-3359.

Maroto, C.; Segura, M.; Ginestar; C.; Uriol, J.; and B. Segura (2012). Aggregation of Stakeholder Preferences in Sustainable Forest Management using AHP. Proceedings of the 1st International Conference on Operations Research and Enterprise Systems (Eds. Luz, C. and Valente, F.), pp. 100-107. Ed. SciTePress. ISBN: 978-989-8425-97-3. DOI: 10.5220/0003697401000107.

Alcaraz, J and C. Maroto (2009) Genetic Algorithms for the Resource-Constrained Project Scheduling Problem. Boletín de Estadística e Investigaci&ocuate;n Operativa. Vol. 25, num. 1, pp. 22-31.

Ruiz, R. and C. Maroto (Guest Editors) (2008): Editorial: The Youngest OR in Europe.  European Journal of Operational Research. Vol.189, Issue 3, september pp. 579-582.

Ruiz, R.; García-Diaz, J.C. and C. Maroto (2007): Considering scheduling and preventive maintenance in the flowshop sequencing problem. Computer & Operations Research. Vol. 34 Issue 11, pp. 3314-3330.

Alcaraz, J and C. Maroto (2006): A hybrid genetic algorithm based on intelligent encoding for project scheduling, chapter 10 in Perspectives in modern Project Scheduling edited by Joanna Józefowska and Jan Weglarz. Ed.  Springer,  USA. pp. 249-274.

Ruiz, R.; Maroto, C. and J. Alcaraz (2006): Two New Robust Genetic Algorithms for the Flowshop Scheduling Problem. OMEGA, The International Journal of Management Science. Vol.34, issue 5, October. pp. 461-476.

Ruiz, R. and C. Maroto (2006): A Genetic Algorithm for Hybrid Flowshops with Sequence Dependent Setup Times and Machine Elegibility. European Journal of Operational Research. Vol.169, Issue 3, march. pp. 781-800.

Maroto, C Ruiz, R.; Alcaraz, J; Vallada, E. and F. Crespo (Editors) (2005): A EURO Conference for Young OR Researchers and Practitioners. PROCEEDINGS BOOK. ESMAP. 434 pp.

Oltra, M.J.; Maroto, C. and B. Segura (2005): Operations Strategy Configurations in Project Process Firms. International Journal of Operations and Production Management. Vol. 25 Nº 5. pp. 429-448.

Crespo-Abril, F. and C. Maroto (2005): Scheduling Resource-Constrained Projects using Branch and Bound and Parallel Computing Techniques. International Journal of Operational Research. Vol. 1 Nos 1/2. pp. 172-187.

Ruiz, R. and C. Maroto (2005): A Comprehensive Review and Evaluation of Permutation Flowshop Heuristics. European Journal of Operational Research. Vol. 165/2. pp. 479-494.

Ruiz, R.; Maroto, C. and J. Alcaraz (2005): Solving the Flowshop Scheduling Problem with Sequence Dependent Setup Times Using Advanced Metaheuristics. European Journal of Operational Research. Vol. 165/1. pp. 34-54.

Vallada, E.; Maroto, C.; Ruiz, R. y B. Segura (2005): Análisis de la Programación de la Producción en el Sector Cerámico Español. Boletín de la Sociedad Española de Cerámica y Vidrio.  Vol. 44 /Número 1 Enero-Febrero. pp. 39-44.

Segura, B.; Vallada, E.; Maroto, C. y R .Ruiz (2004): Análisis del Sistema de Operaciones en Empresas del Sector Cerámico Español. Boletín de la Sociedad Española de Cerámica y Vidrio. Vol. 43 Número 6, Noviembre-Diciembre. pp. 929-932.

Ruiz, R.; Maroto, C. and J. Alcaraz (2004): A Decision Support System for a Real Vehicle Routing Problem. European Journal of Operational Research.  Vol. 153/3. pp. 593-606.

Alcaraz, J.; Maroto, C. and R. Ruiz (2003): Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with Genetic Algorithms. Journal of the Operational Research Society. Vol. 54 number 6. pp. 614-626.

Alcaraz, J. and C. Maroto (2001): A Robust Genetic Algorithm for Resource Allocation in Project Scheduling. Annals of Operations Research. Vol. 102 (1/4), pp. 83-109.

Maroto, C.; Sánchez, L. y Robles, M. (2000): Formación de Médicos Residentes en un Servicio de Radiología: Planificación Óptima Mediante Modelos de Programación Entera. Boletín de la SEIO. Vol. 16/4, pp.2-4.

Maroto, C.; Aliaga, S. and A. Torres (2000): Optimización de Envíos de Pienso a Granjas de Broilers.Boletín de la SEIO. Vol. 16/4, pp.

Lova, A., Maroto, C. and P. Tormos (2000): A Multicriteria Heuristic Method To Improve Resource Allocation in Multiproject Scheduling. European Journal of Operational Research. Vol. 127/2, pp. 408-424.

Maroto, C.; Tormos, P. and A. Lova (1999): The Evolution of Software Quality in Project Scheduling (chapter 11) in PROJECT SCHEDULING: RECENT MODELS, ALGORITHMS AND APPLICATIONS. Kluwer Academic Publishers, 239-259.

International conferences

Maroto, C.; Segura, M.; Segura, B. An aggregate linear programming model to estimate the pollutant and greenhouse gases emissions from livestock. Invited paper. 21st Conference of the international Federation of Operational Research Societies. IFORS 2017. Quebec. Canada. 17-21 July 2017.

Maroto, C.; Gallego, A.; Calafat, C.; Quintanilla, I.; Segura, M.Food security and environmental risks assessment of livestock production by using GIS and PROMETHEE. 24th International Conference on Multiple Criteria Decision Making (MCDM 2017). Ottawa. Canada. 10-14 July 2017.

Segura, B.; Segura, M.; Maroto, C.; Ginestar, C.Goal programming models to estimate national inventories of livestock emissions. 24th International Conference on Multiple Criteria Decision Making (MCDM 2017). Ottawa. Canada. 10-14 July 2017.

Segura, M.; Maroto, C.; Belton, V.; Ginestar, C.; Marqués, I.Collaborative management of ecosystem services in Natural Parks. 24th International Conference on Multiple Criteria Decision Making (MCDM 2017). Ottawa. Canada. 10-14 July 2017.

Maroto, C.; Segura, M.; Segura, B. Supply chain management in food industry by integrating value function and outranking multicriteria methods. Invited paper. 28th European Conference of Operational Research. EURO 2016. Poznan. Poland. 3-6 July 2016.

Maroto, C.; Segura, M.; Villalba, R.; Alos, D.; Segura, B.; Giner, S.; Cuartero, J. Multiple Criteria methodology for supplier evaluation and purchasing management. 23rd International Conference on Multiple Criteria Decision Making MCDM 2015. Hamburg, Germany.

Segura, M.; Maroto, C.; Belton, V. and C. Ginestar. A hybrid multiple criteria method to assess Ecosystem Services. Invited paper. 26th European Conference of Operational Research. EURO 2015. Glasgow, Reino Unido. 12–15 July 2015.

Calafat, C.; Gallego, A.; Quintanilla, I.; Maroto, C. Territorial and environmental evaluation of intensive livestock farms by using multi-criteria techniques. Invited paper. 26th European Conference of Operational Research. EURO 2015. Glasgow, Reino Unido. 12–15 July 2015.

Segura, M.; Maroto, C.; Belton, V. and C. Ginestar. A multiple criteria methodology to classify zones in protected areas: A Mediterranean Case Study. 2nd International MCDA Workshop on PROMETHEE: Research and Case Studies. Bruselas, Bélgica. 23 January 2015.

Maroto, C. (2014). Discrete multiple criteria decision making techniques. New methodology for evaluating and classifying suppliers based on an outranking approach. Invited paper. Euro Summer Institute 2014. OR in Agriculture and Agrifood Industry. Lleida, Spain. 19July – 1 August 2014.

Maroto, C.; Alos, D.; Cuartero, J.; Giner, S.; Segura, M. and Segura, B. (2014). New methodology for evaluating and classifying suppliers based on an outranking approach. Invited paper. IFORS 2014. 20 th Triennial Conference for the International Federation of Operational Research Societies. Barcelona, Spain.13th-18th July 2014.

Segura, M.; Maroto, C. and Ginestar, C. (2014). Management and valuation of ecosystem services of Mediterranean natural parks. Invited paper.IFORS 2014. 20 th Triennial Conference for the International Federation of Operational Research Societies. Barcelona, Spain. 13th-18th July 2014.

Quintanilla, I.; Gallego, A., Calafat, C. and Maroto, C. (2014). A Regional Assessment of Sectorial, Environmental and Social Risks from Livestock Farms by using Multi-Criteria Techniques. Invited paper. IFORS 2014. 20 th Triennial Conference for the International Federation of Operational Research Societies. Barcelona, Spain. 13th-18th July 2014.

Maroto, C.; Alos, D.; Cuartero, J.; Giner, S.; Segura, M. and Segura, B. (2014). Purchasing management by using a hybrid multiple criteria approach based on PROMETHEE method. Ponencia. International MCDA Workshop on PROMETHEE: Research and Case Studies. Brussels, Belgium. 22 January 2014.

Maroto,C.; Segura, M.; Ray, D; Segura, B. (2013): An assessment of methods used in Decision Support Systems for solving forest management problems. Invited paper. XVI EURO - INFORMS. Rome, Italy. 1-4 July 2013

De Castro, M.; Segura, M.; Maroto, C.; Ginestar, C. (2013). Problems, objectives and ecosystem services in proteced areas: A Mediterranean case study. 22nd International Conference on Multiple Criteria Decision Making. Malaga, Spain

Segura, M.;Ray, D.; Maroto, C. (2013). Multiple Criteria Methods in Decision Support Systems for Forest Management. 22nd International Conference on Multiple Criteria Decision Making. Malaga, Spain

Segura, M.;Maroto, C.; Segura, B. (2012). Multiple criteria and Group Decision Methods to Valuate Ecosystem Services. Invited paper. 25th European Conference on Operational Research. Vilnius, Lithuania, 8-11 July 2012

Segura, M.;Maroto, C.; Ginestar, C; Segura, B.; Uriol, J. (2012). A comparison of Multiple Criteria Methods for Group Decision Making in Forest Management. Invited paper. 5th European Conference on Operational Research. Vilnius, Lithuania, 8-11 July 2012

Maroto,C.; Ginestar, C.; Uriol, J.; Segura, M. and Segura, B. (2011): Multiple criteria and participative decision making for sustainable forest management using AHP and Goal Programming. Ponencia invitada. IFORS 2011. 19 th Triennial Conference for the International Federation of Operational Research Societies. Melbourne (Australia).

Maroto,C.; Ginestar, C.; Uriol, J.; and Segura, B. (2011): Strategic Decision Making for Sustainable Forest Management in a Mediterranean Region. Ponencia. 14th Symposium for Systems Analysis in Forest Resources, SSAFR. Maitencillo (Chile).

Segura, B.; Maroto, C. and A. Torres (2010): An Optimization Model to Estimate the Emissions of Pollutant Gases of Spanish Livestock. Ponencia. ALIO-INFORMS Joint International Meeting. Buenos Aires (Argentina).

Maroto, C., Ginestar, C. Uriol, J. and J.F. Usú (2010): Strategic Forest Management Using Multiple Criteria and Group Decision Making.Sponsored: Decision Analysis. ALIO-INFORMS Joint International Meeting. Buenos Aires (Argentina).

Marí-Benlloch, M; Martínez-Gómez, M.; Maroto, C.; Su´rez, J.; (2010): Typologies of Forest Fires in the Mediterranean Area According to Human Activity. Ponencia. Second ICAOR (International Conference on Applied Operational Research). Turku (Finlandia)

Maroto,C.; Ginestar, C. Uriol, J.; Segura, B. and J.F. Usó (2010). A Model for Participative Forest Management in the Mediterranean Area. Ponencia. 24rd European Conference on Operational Research. Lisbon (Portugal).

Marí-Benlloch, M.; Mart&icaute;nez-Gómez, M.; Maroto, C; Suárez, J; Crespo, F. (2009): Characterization of Forest Fires in a Mediterranean Area. Ponencia. International Conference of Computational Methods in Science and Engineering. Proceedings. Rhodes (Greece).

Maroto, C.; Fernández, C.; Segura, B.; García-Rebollar,P.; Alcaraz, J. and A. Torres (2009): A new methodology to estimate the emissions of pollutant gases of Spanish livestock: an aggregate Linear Programming model. Ponencia Invitada. 23rd European Conference on Operational Research. Actas. Bonn (Germany).

Alcaraz, J. and  C. Maroto (2007): A Hybrid Genetic Algorithm based on intelligent encoding for project scheduling. Ponencia  Invitada. International Conference on Operational Research.  Actas. Hong Kong (China).

Alcaraz, J. and  C. Maroto (2006): A Hybrid Genetic Algorithm based on intelligent encoding for project scheduling. EURO XXI. 21th European Conference on Operational Research. OR for better Management of Sustainable Development. Actas. Reykjavik, Iceland.

Alcaraz, J.; Maroto, C. and R. Ruiz (2005): A hybrid genetic algorithms based on intelligent encoding for project scheduling. The Sixth Metaheuristics International Conference (MIC´05).  Actas. Vienna, Austria.

Vallada,E.; Maroto, C. and R. Ruiz (2005): Solving the flowshop scheduling problem with parallel genetic algorithms. . The Sixth Metaheuristics International Conference (MIC´05).  Actas. Vienna, Austria.

Alcaraz, J. and  C. Maroto (2005): A new  solution encoding for solving the resource-constraint project scheduling problem with Genetic Algorithm. Ponencia Invitada. 4th WSEAS International Conference on Applied Mathematics and Computer Science. Actas. Río de Janeiro, Brasil.

Vallada, E.; Maroto, C. and R. Ruiz (2005): Parallelization of genetic algorithms to solve the permutation flowshop scheduling problem. XVIII European Chapter on Combinatorial Optimization (ECCO´05). Minsk, Belarus.

Ruiz, R.; Stützle, T. and  C. Maroto (2004): A simple and effective iterated greedy algorithm for the flowshop scheduling problem. EURO XX. 20th European Conference on Operational Research. Actas. Rhodes (Greece).

Ruiz, R.; García, J.C. and  C. Maroto  (2004): Integrating  preventive maintenance and scheduling in flowshop enviroments. EURO XX. 20th European Conference on Operational Research. Actas. Rhodes (Greece).

Vallada, E.; C. Maroto, C. and R. Ruiz (2004): An Asynchronous Parallel Genetic Algorithm for the Flowshop Scheduling Problem. EURO XX. 20th European Conference on Operational Research. Actas. Rhodes (Greece).

Alcaraz, J. and C. Maroto (2004): Project scheduling  under limited resources with advanced genetic algorithms. Ponencia Invitada. 2nd World Conference on Production and Operations Management (POM). Actas. Cancún (México).

Maroto, C. and R. Ruiz (2004): Genetic algorithms for hybrid flowshops with sequence dependent setup times: An Aplication to the ceramic tile industry. Ponencia Invitada. nd World Conference on Production and Operations Management (POM). Actas. Cancún (México).

Vallada, E.; Maroto, C. and R. Ruiz (2004): A parallel genetic algorithm for the flowshop problem. Ponencia Invitada. nd World Conference on Production and Operations Management (POM). Actas. Cancún (México).

Alcaraz, J.;  Maroto, C. and R. Ruiz  (2004): Improving the performance of genetic algorithms for the RCPS Problem. . Ninth International Workshop on Project Management and Scheduling – PMS 2004. Actas. Nancy (France).

Ruiz, R; Maroto, C. and J. Alcaraz (2004): Genetic algorithms for the flowshop scheduling problem with sequence dependent setup times. Ninth International Workshop on Project Management and Scheduling – PMS 2004. Actas. Nancy (France).

Ruiz, R; Maroto, C. and E. Vallada (2004): A Genetic algorithms for complex hybrid flowshops with sequence dependent setup times. Ninth International Workshop on Project Management and Scheduling – PMS 2004. Actas. Nancy (France).

Ruiz, R; Romeo, J.; Guillamón, O.; Maroto, C. y E. Vallada (2004): Programación Flexible de la Producción en una empresa cerámica. Qualicer 2004 (VIII Congreso Mundial de la Calidad del Azulejo y del Pavimento Cerámico). Actas. Castellón.

Ruiz, R; Maroto, C. and J. Alcaraz  (2003): Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics. ORP3 A Euro Conference for Young OR Researchers. Abstracts. Lambrecht, Germany

Alcaraz,J.; Maroto, C. and R. Ruiz (2003): Multimode Resource Constrained Project Scheduling Problem: An advanced metaheuristics. Fifth Metaheuristics Internacional Conference (MIC2003). Abstracts. Kyoto, Japón.

Ruiz, R. and C. Maroto (2003): New Genetic Algorithms for the Permutation Flowshop Scheduling Problem. Fifth Metaheuristics Internacional Conference (MIC2003). Abstracts. Kyoto, Japón.

Ruiz, R. and C. Maroto (2003): A New Genetic Algorithm for the Permutation Flowshop Scheduling Problem. EURO/INFORMS 2003. Abstracts. Istambul (Turkey).

Vallada, E.; Ruiz, R. and C. Maroto (2003): A Comparison and Evaluation of Heuristic and Metaheuristics for the Flowshop Scheduling Problem. EURO/INFORMS 2003. Abstracts. Istambul (Turkey).

Ruiz, R; Maroto, C. and J. Alcaraz (2003): Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics. ORP3 A Euro Conference for Young OR Researchers. Abstracts. Lambrecht, Germany.

Alcaraz, J.; Maroto, C. y R. Ruiz (2003): Operadores Genéticos Avanzados para Programación de Proyectos en un Contexto Multi-Modo. Actas del 27 Congreso Nacional de Estadística e Investigación Operativa. Edicions de la Universitat de Lleida, pp. 2468-2483.

Ruiz, R. y C. Maroto (2003): Evaluación de Heurísticas para el Problema del Taller de Flujo. Actas del 27 Congreso Nacional de Estadística e Investigación Operativa. Edicions de la Universitat de Lleida, pp. 509-526.

Ruiz, R.; Maroto, C. y J. Alcaraz (2003): Un Algoritmo Genético Híbrido para el Taller de Flujo de Permutación. Actas del 27 Congreso Nacional de Estadística e Investigación Operativa. Edicions de la Universitat de Lleida, pp. 728-744.

Vallada, E.; Maroto, C.; Ruiz, R. y B. Segura (2003): Problemas de Programación de la Producción en el Sector Cerámico Español. Actas del 27 Congreso Nacional de Estadística e Investigación Operativa. Edicions de la Universitat de Lleida, pp. 638-676.

Alcaraz, J. and C. Maroto (2002): A New Genetic Algorithm for the Multi-Mode Resource-Constrained Project Scheduling Problem. Eighth International Workshop on Project Management and Scheduling. Abstracts. Fundación Universidad-Empresa de Valencia, pp.  26-29.

Crespo-Abril, F. and C. Maroto (2002): On the Parallelization of a Branch&Bound Algorithm to Solve the Resource-Constrained Project Scheduling Problem. Eighth International Workshop on Project Management and Scheduling. Abstracts. Fundación Universidad-Empresa de Valencia, pp. 118-120.

Ruiz, R. and C. Maroto (2002): Flexible Manufacturing in the Ceramic Tile Industry. The Eighth International Workshop on Project Management and Scheduling. Abstracts. Fundación Universidad-Empresa de Valencia, pp.  301-304.

Maroto, C. and R. Ruiz (2002): Flexible Manufacturing in the Ceramic Tile Industry using Genetic Algorithms. Sixteenth Triennial Conference of the International Federation of Operational Research Societies. IFORS 2002. Proceedings. Edinburgh (UK)

Alcaraz, J. and C. Maroto (2002):  New Genetic Operators for Solving the RCPSP with Multiple Modes. Sixteenth Triennial Conference of the International Federation of Operational Research Societies. IFORS 2002. Proceedings. Edinburgh (UK)

Maroto, C. and R. Ruiz (2001): A Decision Support System for Truckload Routing. EURO XVIII The European Operational Research Conference. Abstracts. Rotterdam (The Netherlands)

Ruiz, R. and C. Maroto (2001): A Decision Support System for a Real Logistic Problem. ORP3 MEETING - Operational Research Peripatetic Post-Graduate Programme a Euro Conference for Young Researchers. Proceedings. Paris (Francia).

Alcaraz, J. and C. Maroto (2000): A Robust Genetic Algorithm for Resource Allocation in Project Scheduling. EURO XVII. 17th European Conference On Operational Research. Abstracts.Budapest (Hungría).

Oltra, M.J.; Segura, B. and C. Maroto (2000): Operations Priorities Patterns in Project Management. EURO XVII. 17th European Conference On Operational Research. Abstracts.Budapest (Hungría).

Maroto, C.; Sánchez, L. y M. Robles (2000): Formación de Médicos Residentes en un Servicio de Radiología: Planificación Óptima Mediante Modelos de Programación Entera. ACTAS del XXV Congreso Nacional de Estadística e Investigación Operativa. Servicio de Publicaciones de la Universidad de Vigo, pp. 657-658.

Maroto, C.; Aliaga, S. and A. Torres (2000): Optimización de Envíos de Pienso a Granjas de Broilers. ACTAS del XXV Congreso Nacional de Estadística e Investigación Operativa. Servicio de Publicaciones de la Universidad de Vigo, pp. 601-602.

Alcaraz, J. y C. Maroto (2000): Algoritmos Genéticos para la Gestión de Proyectos con Recursos Limitados: Nuevas Técnicas de Cruce. ACTAS del XXV Congreso Nacional de Estadística e Investigación Operativa, pp.211-212.

Maroto, C. and J. Alcaraz (2000): Genetic Algorithms for Project Scheduling: New Crossover Techniques. INFORMS SPRING. Proceedings. Salt Lake City –EEUU.

Oltra, M.J.; Maroto, C. and B. Segura (2000): A Taxonomy of Project Management based on Operations Priorities. INFORMS SPRING. Proceedings. Salt Lake City –EEUU.

Crespo-Abril, F.; Maroto, C. and A. Montesinos (2000): Some Aspects on the Parallelisation of a Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem. Seventh International Workshop on Project Management and Scheduling. Proceeding. Osnabrück, Germany.

Alcaraz, J. and C. Maroto (1999): Resource Allocation in Project Management by an Adaptive Genetic Algorithm. INFORMS SPRING. Proceedings. Cincinnati –EEUU.

Crespo-Abril, F.; Maroto, C. and A. Montesinos (1999): Parallel Branch & Bound Experiences Solving the Resource Constrained Project Scheduling Problem. INFORMS SPRING. Proceedings. Cincinnati –EEUU.

Tormos, P.; Lova, A. and C. Maroto (1999): An Interactive Decision Support System Integrated into Project Management Software. Proceedings. Cincinnati –EEUU.

Maroto, C.; Tormos, P. and A. Lova (1998): The Quality of Project Management Software Through Ten Years of Evolution. 16 th European Conference on Operational Research. Abstracts. Brussels, Belgium

Lova, A.; Maroto, C. and P.Tormos (1998): A Multicriteria Heuristic Method for Resource Allocation in Project Scheduling. 16 th European Conference on Operational Research. Abstracts. Brussels, Belgium

Maroto, C; Tormos, P. and A. Lova (1998): Software Quality in Single and Multiple Project Scheduling. Sixth International Workshop on Project Management and Scheduling. Proceedings. Bogaziçi University. Istanbul.Turkey,  pp. 94-97.

Alcaraz, J. and C. Maroto (1998): A Genetic Algorithms for the Resource Constrained Project Scheduling Problem. Sixth International Workshop on Project Management and Scheduling. Proceedings. Bogaziçi University. Istanbul.Turkey,  pp, 7-10.

Crespo-Abril, F. and C. Maroto (1998): An Exact Parallel Branch and Bound Algorithm for the Resource Constrained Project Scheduling Problem. Sixth International Workshop on Project Management and Scheduling. Proceedings. Bogaziçi University. Istanbul.Turkey,  pp. 27-30.

Lova, A.; Maroto, C. and P. Tormos (1998): Resource Constrained Multiproject Scheduling: A Multicriteria Heuristic Algorithm. Sixth International Workshop on Project Management and Scheduling. Proceedings. Bogaziçi University. Istanbul.Turkey,  pp. 90-93 .

Maroto, C.; Lova, A.; Alcaraz, J. and P. Tormos (1997): Resource Allocation in Single and Multiple Projects: Algorithms and Professional Software. XV EURO and XXXIV INFORMS Joint International Meeting: OR/MS for the New Millennium. Abstracts.

Tormos, P.; Maroto, C. and A. Lova (1997): The Resource Constrained Project Scheduling Problem: New Criteria Based on Resources. XV EURO and XXXIV INFORMS Joint International Meeting: OR/MS for the New Millennium. Abstracts.

National conferences

Segura, M.; Maroto, C. A hybrid multiple criteria approach to improve supplier relationship management: A PROMETHEE and MAUT comparison. 1st Spanish Young Statisticians and Operational Researchers Meeting. Granada, 13th-15th November 2017

Segura, M.; Maroto, C. y Ginestar, C.Metodología multicriterio para valorar y gestionar los servicios del ecosistema en áreas protegidas. XXXVI Congreso Nacional de Estadística e Investigación Operativa y X Jornadas de Estadística Pública. SEIO 2016, Toledo, 5-7 septiembre 2016.

Maroto, C.; Segura, M.; y Segura, B. Gestión de la cadena de suministro mediante técnicas multicriterio. Una aplicación a la industria agroalimentaria. X Reunión del Grupo Español de Decisión Multicriterio. Madrid, 10 junio 2016.

Segura, M.; Maroto, C. y Ginestar, C. Valoración de los Servicios del Ecosistema en la Serra d’Espadà. II Congreso Forestal de la Comunitat Valenciana. Segorbe (Castellón). 25-26 febrero, 2016. Actas. ISBN 978-84-9133-019-6.

Segura, M.; Maroto, C.; Segarra, M.V.; Segura, B.; Uriol, J (2013): Preferencias Sociales en la Gestión Forestal Sostenible del Monte Mediterráneo. 6º Congreso Forestal Español. Actas. 6CFE01-574. Sociedad Española de Ciencias Forestales. Vitoria Gasteiz. ISBN: 978-84-937964-9-5.

Segura, M.; Ray, D.; Maroto, C. (2013): Técnicas implementadas en los sistemas de ayuda a la toma de decisiones en gestión forestal. XXXIV Congreso Nacional de Estadística e Investigación Operativa y VIII Jornadas de Estadística Pública. Castellón

Maroto, C.; Segura, M.; Ginestar, C.; Uriol, J. y Segura, B. (2012): Un Modelo de Gestión Sostenible del Monte Mediterráneo: Agregación de Preferencias mediante Programación por Metas y AHP. Ponencia. XXXIII Congreso Nacional de Estadística e Investigación Operativa y VII Jornadas de Estadística Pública. Actas. Madrid.

Crespo, F; Martínez, M; Montesinos, A., Suárez, J. y C. Maroto (2009): Análisis de los incendios forestales en la Comunidad Valenciana. XXXI Congreso Nacional de Estadística e Investigación Operativa y V Jornadas de Estadística Pública. Actas.Murcia

Alcaraz, J. y Maroto, C. (2006): Un algoritmo genético híbrido basado en una codificación innovadora para el RCPSP. 29 Congreso Nacional de Estadística e Investigación Operativa y III Jornadas de Estadística Pública. Actas, páginas 651-652. Puerto de la Cruz, Tenerife

Alcaraz, J.; Maroto, C. y Ruiz, R. (2004): Mejoras en los Algoritmos Genéticos para la Programación de Proyectos con Recursos Limitados. XXVIII Congreso Nacional de Estadística e Investigación Operativa. Actas, páginas 479-480. Cádiz.

Ruiz, R.; García, J.C. y Maroto, C. (2004): Secuenciación y mantenimiento preventivo en talleres de flujo. XXVIII Congreso Nacional de Estadística e Investigación Operativa.  Actas, páginas 461-462. Cádiz.

Ruiz, R.;  Maroto, C. y Alcaraz, J. (2004): Soluciones para complejos problemas de programación de la producción. XXVIII Congreso Nacional de Estadística e Investigación Operativa Actas, páginas 465-466. Cádiz.

Vallada, E.;  Maroto, C. y Ruiz, R. (2004): Algoritmos genéticos paralelos para el problema del taller de flujo. XXVIII Congreso Nacional de Estadística e Investigación Operativa .Actas, páginas 451-452. Cádiz.

Alcaraz, J.; Maroto, C. y R. Ruiz (2003): Operadores Genéticos Avanzados para Programación de Proyectos en un Contexto Multi-Modo. Actas del 27 Congreso Nacional de Estadística e Investigación Operativa. Edicions de la Universitat de Lleida, pp. 2468-2483.

Ruiz, R. y C. Maroto (2003): Evaluación de Heurísticas para el Problema del Taller de Flujo. Actas del 27 Congreso Nacional de Estadística e Investigación Operativa. Edicions de la Universitat de Lleida, pp. 509-526.

Ruiz, R.; Maroto, C. y J. Alcaraz (2003): Un Algoritmo Genético Híbrido para el Taller de Flujo de Permutación. Actas del 27 Congreso Nacional de Estadística e Investigación Operativa. Edicions de la Universitat de Lleida, pp. 728-744.

Vallada, E.; Maroto, C.; Ruiz, R. y B. Segura (2003): Problemas de Programación de la Producción en el Sector Cerámico Español. Actas del 27 Congreso Nacional de Estadística e Investigación Operativa. Edicions de la Universitat de Lleida, pp. 638-676.

Ruiz, R. y C. Maroto (2001): Un Sistema de Ayuda a la Toma de Decisiones para un Problema Real de Logística. XXVI Congreso Nacional de Estadística e Investigación Operativa. Actas. Úbeda (Jaén).